StreetScooter Work L EV charger: which one fits best?
The StreetScooter Work L is an electric delivery van with a 40 kWh battery and a maximum AC charging power of 11 kW. That charging power decides which charger makes sense: a more powerful charger will not charge this van any faster than 11 kW. The shorter StreetScooter Work has its own page, and our StreetScooter EV charger overview lists every StreetScooter model.
For the StreetScooter Work L we recommend a charger from our 11 kW EV chargers. This applies to the updated Work L that StreetScooter presented in 2019. Older vans charge more slowly, so check your vehicle documents or the dashboard display if you are not sure which version you drive.
Charging specifications of the StreetScooter Work L
| Specification | Value |
|---|---|
| Usable battery capacity | 40 kWh |
| Maximum AC charging power at home | 11 kW (three-phase) |
| Charging time with an 11 kW EV charger | approx. 3.5 hours |
| Charging time on a single-phase connection (max. 3.7 kW) | approx. 11 hours |
| Charging connector | Type 2 (Mennekes) |
| DC fast charging | Not available |
Which EV charger fits the StreetScooter Work L?
At home, the Work L charges at up to 11 kW via a 3-phase connection, so an 11 kW charger is the logical choice. A more powerful 22 kW charger adds nothing, because the van itself never takes more than 11 kW. With only a single-phase connection at home, the van charges considerably more slowly.
A MID meter is a calibrated kWh meter built into the charger. It measures the electricity you charge at home separately from your household consumption, so you know exactly what charging the van costs. For a van that works for your business, that reliable record is almost indispensable, and private drivers benefit from it just as much. Our range includes EV chargers with a built-in MID meter, 11 kW models among them.
Every charger in our 11 kW EV chargers range delivers the full 11 kW the Work L can take, and our home chargers are a good place to start comparing. The Work L uses a Type 2 connection, like most modern chargers. You need a matching Type 2 charging cable for public charging points, and at home only if your charger has no fixed cable.
How long does the StreetScooter Work L take to charge?
With an 11 kW charger, the calculation for the 40 kWh battery comes to about 3.5 hours from empty to full (40 kWh divided by 11 kW). In practice it takes longer: when the updated van was launched in 2019, reports put the time to 80 percent at about three and a half to five hours. Either way, the van is ready overnight for the next working day. On a single-phase connection charging takes considerably longer, so for daily use a 3-phase connection with an 11 kW charger is the better choice.
Installing your EV charger
We always recommend having the connection made by a qualified electrician, because it is safer and matters for your insurance. Wallbox Discounter can arrange the installation in the Netherlands, Flemish Belgium and Germany. In Germany, that starts with a free quote. For a van that has to charge every night, a professional installation is well worth it.
Frequently asked questions
Does the StreetScooter Work L need a 3-phase connection?
To reach the full 11 kW, yes. On a single-phase connection the Work L charges considerably more slowly, however powerful the charger is. With a 3-phase connection you use the full 11 kW and the battery reaches 80 percent in roughly three and a half to five hours.
Why is a MID meter important for the Work L?
A MID meter is a calibrated kWh meter that records your charging consumption accurately. For a van used for business, it gives you a reliable record of the electricity every charge uses. Private drivers benefit too: you see what charging costs, separately from the rest of your household consumption.


