Think City EV charger: which one fits best?
The Think City charges at home at up to 3.7 kW over a single-phase connection. That is modest next to a modern EV, but it makes the choice simple. This compact city car needs no heavy three-phase charger. A single-phase charger or a portable charger uses the car's full power. The Think City is the only model in our Think EV charger overview, so the choice below applies to every version.
For the Think City we recommend a charger from our 7.4 kW EV chargers.
Charging specifications of the Think City
| Specification | Value |
|---|---|
| Max. AC charging power (home) | 3.7 kW (single-phase, 16 A) |
| Home connection | Single-phase is sufficient, any meter box can handle it |
| Charging time with a 3.7 kW charger | One night for a full charge (depending on the battery in your version) |
| Car charging connector | Check which connector your Think City has |
| DC fast charging | Not available |
The Think City is an older, fully electric city car that is no longer built. Its charging behaviour differs from a new EV: the maximum power sits at 3.7 kW, and a simple single-phase charger already delivers that. A heavier charger will not charge this car faster, because the car sets the limit, not the charger.
Which charger suits the Think City?
Because the Think City charges at 3.7 kW, a single-phase charger from our 7.4 kW EV chargers is the logical choice. It delivers the car's full 3.7 kW with ease. One honest note about billing: a MID-certified kWh meter, which measures your charging use accurately, is not available at 7.4 kW. Chargers with a MID meter start at 11 kW, and a business driver needs one to bill charging sessions. If that matters to you, step up to an 11 kW charger and compare the chargers with a MID meter. Otherwise a simple charger from our home chargers is all this car needs.
Not sure about your Think City's connector? Check which inlet the car has before you pick a cable. For a Type 1 car you take a matching Type 1 to Type 2 charging cable. We always advise having the connection carried out by a qualified installer, which is safer and matters for your insurance. Wallbox Discounter arranges the installation in the Netherlands, Flemish Belgium and Germany. Shipping runs worldwide, but installation stays within those three countries.
How long does the Think City take to charge?
On a 3.7 kW charger you fill the Think City overnight. The exact time depends on your version's battery, but in practice it barely matters: plug in during the evening and you can leave in the morning. A portable charger reaches the same 3.7 kW for this car, so it is a fine alternative if you would rather not fit a fixed unit.
Frequently asked questions
Does the Think City need a three-phase connection?
No. The Think City charges at up to 3.7 kW over single-phase. Any meter box handles that, including an existing single-phase connection. A three-phase charger will not charge this car faster. Consider three-phase only if you expect to drive a modern EV soon that accepts more power.
Why does a MID meter matter for the Think City?
A MID-certified kWh meter records your charging use accurately, which is the condition for billing charging sessions. At 7.4 kW there is no charger with a MID meter, as they start at 11 kW. So you would only gain this if you choose an 11 kW charger instead.


